June 26, reporters learned from the Qinghai-Tibet Railway Company,  
hopper wagon" href="http://www.railway-wagon.com/hopper-wagon-1.html">
 Shuyun passenger tourism flow, the flow of students and visiting  relatives mainly concentrated passenger flow peak in late July to early  August, the highest daily expected to send passengers 50 000 people.  Since the pull on the railway and blue new high-speed rail operators,  railway companies this year Shuyun daily passenger delivery volume and  delivery volume will be higher than in previous years.

For maximum convenience Qinghai and the people traveling by train 
railway wagon" href="http://www.railway-wagon.com/railway-wagon-1.html">
, the  railway company 
flat wagon" href="http://www.railway-wagon.com/flat-wagon-1.html">
 in this year March 20 and May 20 basis two adjustments  passenger train diagram on July 1 for the third tune diagram, has CDB to  Shenyang Xining, Xining to Tianjin, Xining to Hefei three pairs of  passenger trains, Xining to open or via Urumqi, Xining, such as  Lianyungang, east south K1354 / 1 second-class passenger train increased  22.5 pairs further expand the Qinghai and Ways and foreign exchange,  the release of the Qinghai-Tibet Railway Corporation tube transport  capacity and reduced the travel time, improve the travel environment,  which has laid a good foundation for this year Shuyun.
July 1 to August 22, the Qinghai-Tibet Railway from Lhasa to Xigaze to  open daily passenger train Z8803; July 2 to August 23, a day to open  Xigaze to Lhasa Z8804 passenger train; July 1 to July 31, the daily  opening line from Xining to door source D8901 / 2, D8903 / 4, D8905 / 6,  D8907 / 8 times heavy linkage EMU.
Qinghai-Tibet Railway Company will rationalize the restricted zone  ticket, timely to open the passenger train passenger train in passenger  centralized add a sleeper and hard seat. Especially for the tourist  season Shuyun Qinghai and Tibet, the Qinghai-Tibet Railway Corporation  to take Guangzhou to Lhasa, Chengdu (Chongqing) to Lhasa, Tibet  passenger train transfer station in Xining way out of Tibet to open the  passenger train, improve access to Tibetan Shuyun passenger transport  ability to meet the travel needs of passengers.
In perfect Internet, telephone and other multi-channel way ticket  
hopper wagon" href="http://www.railway-wagon.com/hopper-wagon-1.html">
 on the basis of the Qinghai-Tibet Railway Corporation major tube  station ticket windows all open, and opened 24 ticket outlets, all major  passenger additional student ticket window, to extend the booking time,  Station Xining, Golmud station 24-hour ticket, the passenger train  display Published by Electronic Development Bank, more than tickets and  more information.